From Statistical Process Control to Full Control - 2
Not logged in - Login

SUBDIVISIONS

Return to main menu

In order to map data coming from the shopfloor each measure has to be collected referred to a specific workstation. To do that the workstations have to created in the container plant. Each subdiviion requires just code and description, the code is the key value to be used in the xml files